Patient Readiness · Hospitals · SNF · Assisted Living

Defend-in-place works — until the power doesn't.

Hospitals, skilled nursing, and assisted living are built to shelter in place. But when a fire, flood, or grid failure forces a vertical evacuation, non-ambulatory patients are the whole problem — and surveyors know it. Outpost closes that gap with chairs, transfer kits, staff training, and drills you can document.

Run a Residential Care Facility for the Elderly? See the RCFE Evac & Power Readiness System →

What you answer to

The people who audit you are already asking this question.

CMS Emergency Preparedness Rule

Requires a documented evacuation plan and the means to carry it out — not just an intent to shelter.

Joint Commission / State surveys

Life Safety surveyors look for equipment and trained staff to move non-ambulatory patients down stairs.

NFPA 101 Life Safety Code

Vertical evacuation of occupants who can't self-evacuate is a designed capability, not an afterthought.

What we deploy

Equipment, training, and proof — in one deployment.

  • HALO evacuation chairs
    Staged in the stairwells that serve your patient floors — manual Swift or powered Power depending on flights and load.
  • ProMove transfer kits
    For bed-to-chair and floor transfers by staff who aren't trained lifters.
  • Hands-on staff training
    Your team practices with the actual equipment, on your actual stairs, on shift.
  • Quarterly drills
    Scheduled, documented drills that keep the capability real between surveys.
  • 12-month audit log
    The binder a Life Safety surveyor or insurer asks for — dates, names, serials, signatures.
  • Signed certificate
    Deployment certificate for your emergency-preparedness file and your board.
Free one-pager

Get the Healthcare readiness flyer

The obligation, the highlights, and a stairwell-readiness checklist — on one page you can forward to your team. We'll email it now.

Free · emailed instantly · we reply from drew@outpostprep.com.
Coverage Designer · Patient Readiness

Build your coverage in 30 seconds

Set your building, pick your chairs, and watch three tiers of coverage price themselves.

Live estimate

Care facilities (incl. RCFEs) are expected to move a non-ambulatory patient down every stairwell — one per stairwell is the baseline; one per floor per stairwell is full coverage.

How many stairwells serving patient floors?
2
How many patient floors?
3
What best fits your stairs & passengers?
Add to the plan?
Your build
2 stairwells serving patient floors × 3 patient floors · HALO Swift
Your three tiers of coverage
Baseline
2chairs
HALO Swift
HALO Swift
One chair per stairwell — the compliance baseline.
★ Recommended
Recommended
4chairs
HALO Swift
HALO Swift
Adds coverage on your upper floors so no one waits long.
Full
6chairs
HALO Swift
HALO Swift
A chair on every floor of every stairwell — nobody waits.
We'll email your numbered estimate in seconds — no call required.

Estimate only — final counts confirmed on your walkthrough. Chairs & slings are quoted; Go-Bags and SunCase are priced online.

Tell us the facility. We'll send the spec.

One-page spec and a fixed price for your building — no call required.

Free · fixed-price spec · we reply from drew@outpostprep.com.